Explainer · Production
If you manufacture anything with sub-assemblies, a single-level parts list is not enough. You need a multi-level Bill of Materials (BOM). Done right, a multi-level BOM gives you accurate costing, clean purchase planning and reliable stock. This explainer breaks it down in plain language.
A Bill of Materials lists everything needed to make a product — raw materials, components and quantities. A single-level BOM lists the direct inputs of one product. A multi-level BOM also breaks down each sub-assembly into its own inputs, creating a tree from the finished product down to raw materials.
Imagine a product that is assembled from two sub-assemblies, and each sub-assembly is made from raw materials:
| Level | Item | Made from |
|---|---|---|
| 0 | Finished Product | Sub-assembly A + Sub-assembly B |
| 1 | Sub-assembly A | Raw material 1 + Raw material 2 |
| 1 | Sub-assembly B | Raw material 3 + Raw material 4 |
With this structure, the system knows exactly how much of every raw material a finished-product order needs — all the way down.
LastingERP supports multi-level BOM with stage-wise production tracking, so material and output are recorded at each level, costs roll up automatically, and purchasing and stock stay accurate — whether a sub-assembly is made in-house or through job work.
Book a demo and watch costs roll up level by level.
Book a Free Demo +91-9888886589General educational information to help manufacturers understand BOM concepts. Verify specifics for your process during a demo.
Book a free 30-minute demo. Share one of your BOMs and we will walk through it live, from purchase to production to GST e-invoice.